For Construction Contractors

Read every
bid document.
In minutes.

Upload your RPQ, ITB, addenda and plan sets. Get a structured 12-step analysis: scope by CSI division, inconsistencies, RFI list, quantity takeoffs, and a budget-vs-market SOV — exported in Word and Excel.

CSI MasterFormat 2024Code & NOA awareIndustry Markup ChainOffice / Google export
Bid BriefSAMPLE
Project
RPQ 2026BPMADA — Black Point Marina ADA Phase II
Published Budget
$320,000
2026 Market
$415K – $450K
Variance
+30 – 40%
Bid Recommendation
MARKET
Top Risks Identified
  • HVHZ-rated coastal hardware not specified — pricing risk
  • V.I.F. concrete dimensions on sheet S-1.2
  • UAP applicability ambiguous — RFI #3 generated
Output ready
.docx.xlsx
How it works

Six steps from solicitation to signed bid.

No magic, no hidden process. The same workflow seasoned estimators have used for years — automated, structured, and fully transparent. Every figure shows its origin. Every assumption is logged.

01

Create the project

Pick the bid type (RFP, ITB, RPQ, PIP, Municipal, Federal). Enter the solicitation number from the bid header. No data is pre-filled — every field is yours.

02

Gather the bid documents

Gather the documents received for the project — the ITB/RFP/RPQ, every addendum, attachments and General Conditions.

03

Upload bid docs and plans

Drag and drop into two zones: Bid Documents (specs, addenda, GC) and Plans (drawing sets). PDF, DOCX, XLSX accepted.

04

Run the analysis

One click. The engine reads everything, runs a 12-step estimating workflow: scope, gaps, RFIs, takeoffs, SOV.

05

Review results

Tabbed dashboard: Executive Summary, Scope by CSI Division, Inconsistencies, RFI list, Takeoffs, Budget vs Market SOV, Comparison.

06

Download Word + Excel

Office and Google compatible. Excel SOV uses CSI 2024 format with the full industry markup chain (15% OH&P → 2.5% Bond → UAP → 0.25% IG).

Document Triage

Per-document scope summary. Flags every V.I.F. dimension and 'or approved equal' clause as risk.

RFI Generator

Email-ready RFI list with reference, question, impact, and assumption used for the bid.

Budget vs Market

Two SOVs side-by-side — published budget vs realistic 2026 market pricing with jurisdiction-specific premiums baked in.

Code & Compliance Aware

Picks up jurisdictional rules from the docs — HVHZ / NOA, prevailing wage, MBE/DBE goals, ASTM and FBC references.

Ready when you are

Stop reading 800-page bid sets line-by-line.

Upload, analyze, download. Every solicitation gets the same rigorous treatment — every time.

Easy Bids
EASY BIDS
A field tool for construction contractors bidding public-sector RFP / ITB / RPQ / Municipal projects.
PricingTermsPrivacyRefunds

AI Disclaimer:Estimates and analyses are AI-generated for informational purposes only. AI can make mistakes. Output is a preliminary draft — verify every line item, citation, quantity and dollar figure against source documents. Not professional advice. Not affiliated with any government agency.

Made with Emergent